Doty Bros, Equipment Company A2013-36 \ 4ti smitsisisma 14000 City Center Drive Chino Hills, CA 91709 (909) 364-2600 July 10, 2013 Doty Bros. Equipment Company Attn: Phil Dennis 11232 E. Firestone Blvd. Norwalk, CA 92517 Dear Mr. Dennis: RE: Maintenance Agreement No. A13-36 At their regular meeting held July 9, 2013, the City Council of the City of Chino Hills authorized execution of Maintenance Agreement No. A13-36 for on-call water, sewer, and storm drain system repair services in an amount not-to-exceed $65,000. Enclosed for your records is a fully executed copy of the agreement. Should you have any questions on this matter, you may contact Public Works Director Nadeem Majaj at (909) 364-2800. Very truly yours CITY OF CHINO HILLS /2/1 • ind I e MARY M. .f c$UFFEE, CMC CITY CLQ RK Enclosure cc: Judy Lancaster, Finance Director Raymond Hansen, Senior Administrative Analyst Mary Grunder, Administrative Analyst II 64 COul2Cd Art Bennett • Ed M. Graham 3 Ray Marquez • Cynthia Moran • Peter J. Rogers A13-310 MAINTENANCE AGREEMENT BETWEEN THE CITY OF CHINO HILLS AND DOTY BROS. EQUIPMENT COMPANY THIS MAINTENANCE AGREEMENT ("Agreement") is made and entered into this 9th day of July, 2013, by and between the CITY OF CHINO HILLS, a general law city and municipal corporation ("CITY") and DOTY BROS. EQUIPMENT COMPANY ("CONTRACTOR"). The Parties agree as follows: 1. CONSIDERATION As partial consideration, CONTRACTOR agrees to perform the work listed in the SCOPE OF SERVICES, below; A. As additional consideration, CONTRACTOR and CITY agree to abide by the terms and conditions contained in this Agreement; B. As additional consideration, CITY agrees to pay CONTRACTOR on an as-billed basis an amount not to exceed $65,000 annually as set forth in the attached Exhibit"A,"which is incorporated by reference, for CONTRACTOR's services. CITY will pay such amount promptly, but not later than thirty (30) days after receiving CONTRACTOR's invoice. 2. TERM The term of this Agreement will be from July 10, 2013, to June 30, 2014. The Agreement may be renewed for two additional one-year terms upon mutual consent of the parties. 3. SCOPE OF SERVICES A. CONTRACTOR will perform services listed in the attached Exhibit A. B. CONTRACTOR will, in a workmanlike manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONTRACTOR by this Agreement. 4. PREVAILING WAGES A. Pursuant to Labor Code § 1720, and as specified in 8 California Code of Regulations § 16000, CONTRACTOR must pay its workers prevailing wages. It Page 1 of 8 is CONTRACTOR's responsibility to interpret and implement any prevailing wage requirements and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws. B. In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY's City Clerk or the website for State of California Prevailing wage determination at htto://www.dir.ca.aov/DLSR/PWD. CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site. C. CITY directs CONTRACTOR's attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor. D. Labor Code § 1777.5 requires CONTRACTOR or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the contract, The ratio of apprentices to journeymen in such cases will not be less than one to five except: I. When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or H. When the number of apprentices in training in the area exceeds a ratio of one to five, or Hi. When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or iv, When CONTRACTOR provides evidence that CONTRACTOR employs regis- tered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. v. CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions. vi. CONTRACTOR and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices. Page 2 of 8 vii. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. E. CONTRACTOR and its subcontractors must keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with this Agreement. The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement. If requested by CITY, CONTRACTOR must provide copies of the records at its cost. 5. FAMILIARITY WITH WORK A. By executing this Agreement, CONTRACTOR represents that CONTRACTOR has i. Thoroughly investigated and considered the scope of services to be performed; ii. Carefully considered how the services should be performed; and Hi. Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement. B. If services involve work upon any site, CONTRACTOR warrants that CONTRACTOR has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONTRACTOR discover any latent or unknown conditions that may materially affect the performance of the services, CONTRACTOR will immediately inform CITY of such fact and will not proceed except at CONTRACTOR's own risk until written instructions are received from CITY. 6. INSURANCE A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONTRACTOR will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Tvoe of Insurance Limits (combined single) Commercial general liability: $1,000,000 Business automobile liability $1,000,000 Workers compensation Statutory requirement. B. Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CO 00 01 11 85 or 88. The amount of insurance set forth Page 3 of 8 above will be a combined single lim€t per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by City will be excess thereto. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to City. C. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). D. CONTRACTOR will furnish to City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by City from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "A:VII." Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. CONTRACTOR will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. E. Should CONTRACTOR, for any reason, fail to obtain and maintain the insurance required by this Agreement, City may obtain such coverage at CONTRACTOR's expense and deduct the cost of such insurance from payments due to CONTRACTOR under this Agreement or terminate. 7. TIME FOR PERFORMANCE CONTRACTOR will not perform any work under this Agreement until: A. CONTRACTOR furnishes proof of insurance as required under Section 6 of this Agreement; and B. CITY gives CONTRACTOR a written Notice to Proceed. C. Should CONTRACTOR begin work in advance of receiving written authorization to proceed, any such professional services are at CONTRACTOR's own risk. 8. TERMINATION A. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination will be in writing. B. CONTRACTOR may terminate this Agreement upon providing written notice to CITY at least thirty(30) days before the effective termination date. Page 4 of 8 C. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated. D. By executing this document, CONTRACTOR waives any and all claims for damages that might otherwise arise from CITY's termination under this Section. 9. INDEMNIFICATION A. CONTRACTOR indemnifies and holds CITY harmless from and against any claim, action, damages, costs (Including, without limitation, reasonable attorney's fees and penalties), injuries, or liability, arising out of this Agreement, or its performance including, without limitation, damages or penalties arising from CONTRACTOR's removal, remediation, response or other plan concerning any Hazardous Waste resulting in the release of any hazardous substance into the environment, except for such loss or damage arising from CITY's sole negligence or willful misconduct. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of this Agreement, or its performance, CONTRACTOR will defend CITY (at CITY's request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or otherwise. B. For purposes of this section "CITY" includes CITY's officers, officials, employees, agents, representatives, and volunteers. C. CONTRACTOR expressly agrees that this release, waiver, and indemnity agreement is intended to be as broad and inclusive as is permitted by the law of the State of California and that if any portion is held invalid, it is agreed that the balance will, notwithstanding, continue in full legal force and effect. D. It is expressly understood and agreed that the foregoing provisions will survive termination of this Agreement. E. The requirements as to the types and limits of insurance coverage to be maintained by CONTRACTOR as required by this Agreement, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONTRACTOR pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification. 10. INDEPENDENT CONTRACTOR CITY and CONTRACTOR agree that CONTRACTOR will act as an independent contractor and will have control of all work and the manner in which is it performed. CONTRACTOR will be free to contract for similar service to be performed for other employers while under contract with CITY. CONTRACTOR is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, Page 5 of 8 bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the work or to exercise a measure of control over the work means that CONTRACTOR will follow the direction of the CITY as to end results of the work only. 11.NOTICES A. All notices given or required to be given pursuant to this Agreement will be in writing and may be given by personal delivery or by mail. Notice sent by mail will be addressed as follows: To CITY: Attn: City Clerk City of Chino Hills 14000 City Center Drive Chino Hills, CA 91709 To CONTRACTOR: Attn: Phil Dennis Doty Bros. Equipment Company 11232 E. Firestone Blvd. Norwalk, CA 90650 B. When addressed in accordance with this paragraph, notices will be deemed given upon deposit in the United States mail, postage prepaid. In all other instances, notices will be deemed given at the time of actual delivery. C. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 12.TAXPAYER IDENTIFICATION NUMBER CONTRACTOR will provide CITY with a Taxpayer Identification Number. 13.WAIVER A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character. 14.CONSTRUCTION The language of each part of this Agreement will be construed simply and according to its fair meaning, and this Agreement will never be construed either for or against either party. Page 6 of 8 15.SEVERABLE If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect. 16.CAPTIONS The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 17.WAIVER Waiver of any provision of this Agreement will not be deemed to constitute a waiver of any other provision, nor will such waiver constitute a continuing waiver. 18.INTERPRETATION This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in San Bernardino County. 19.AUTHORITY/MODIFICATION This Agreement may be subject to and conditioned upon approval and ratification by the Chino Hills City Council. This Agreement is not binding upon CITY until executed by the City Manager. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written agreement. CITY's city manager may execute any such amendment on behalf of CITY. 20.EFFECT OF CONFLICT In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement, its attachments, the purchase order, or notice to proceed, the provisions of this Agreement will govern and control. 21.CAPTIONS The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 22.FORCE MAJEURE Should performance of this Agreement be prevented due to fire, flood, explosion, war, terrorist act, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' control, then the Agreement will immediately terminate without obligation of either party to the other. Page 7 of 8 23,ENTIRE AGREEMENT This Agreement and its one attachment constitutes the sole agreement between CONTRACTOR and CITY respecting lead based stabilization. To the extent that there are additional terms and conditions contained in Exhibit "A" that are not in conflict with this Agreement, those terms are incorporated as if fully set forth above. There are no other understandings, terms or other agreements expressed or implied, oral or written. IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written. CITY OF CHINO HILLS DOTY • : * - •UIPMENT COMPANY il "1111 C--)=JL" ---)_. c-7, e.,^4,a_ Peter J. Rog- iii.yor �a M.C. ("Chris") Christy Name (Printed) President Title ATTEST: i Al Mary ffee, City Clerk it '41" di APPROV D AS TO FORM: MARK D. HENSLEY, City Attorney By: (L-4— :V1--'"Q '1 Y Page 8 of 8 EXHIBIT A I hilly , • Construction COST PLUS RATES SOUTHERN CALIFORNIA COST PLUS RATES EFFECTIVE JULY 1,2013 TO JUNE 30,2014 PAY STRAIGHT OVER DOUBLE PAY STRAIGHT OVER DOUBLE CRAFTSMAN/CLASS CODE TIME TIME TIME CRAFTSMAN/CLASS CODE TIME TIME TIME CARPENTERS OPERATING ENGINEERS General Foreman CGF 91.79 128.74 165.68 General Foreman,Appdx,A OGF 102.94 140.89 178.84 Operating Foreman COF 90.46 126.74 163.02 Foreman,Appdx.A OFM 99.61 135.89 172.17 Foreman CFM 86.79 121.23 155.68 Group 1,Appdx.A-Oiler 061 91.30 123.43 155.55 Journeyman CIM 81.78 113.73 145.67 Group 2,Appdx.A-Oiler OG2 92.65 125.45 158.25 Shingler CSJ 82.00 114.05 146.10 Group 8,Appdx.A-Universal 068 96.27 130.88 165.49 Apprentice-8th Period(90%) CA8 75.40 104.14 132.89 Group 10,Appdx.A-Mechanic OGA 96.47 131.18 165.89 Group 8,Appdx.B-Crane<25 Tons OB8 96.77 131.63 166.49 MILLWRIGHTS Group 9,Appdx.B-Crane>25 Tons OB9 97.06 132.06 167.06 General Foreman CMG 92.63 129.99 167.35 Apprentice,Grp8,Appdx A-Step 6(90%) 0A6 89.35 120.50 151.65 Foreman CMF 87.62 122.48 157.34 Journeyman CMI 82.62 114.98 147.34 U.A.PIPEFITTERS/WELDERS Apprentice-8th Period(95%) CM8 72.91 100.42 127.92 INDUSTRIAL General Foreman IGF 115.46 157.75 200.05 CEMENT MASONS Foreman IFM 108.37 147.29 186.20 Foreman MFM 84.47 112.70 140.93 Journeyman-Welder/Fitter IIM 97.70 131.53 165.37 Journeyman MIM 79.46 105.19 130.92 Industrial Welder IIW 104.47 141.69 178.91 F&T Machine Operator MTO 79.88 105.82 131.75 Apprentice-Fifth Year IA5 76.73 103.80 130.88 Apprentice-8th 6 Mos.(90%) MM 74.32 97.47 120.63 SHORTLINE(LOCAL 250) LABORERS Foreman SFM 105.27 145.66 183.03 Operator General Foreman LOG 99.53 137.48 175.43 Journeyman(Welder/Fitter) SJM 98.58 135.63 169.91 Operator Foreman LOF 96.20 132.47 168.75 Welder Helper SWH 60.28 81.21 99.64 General Foreman LGF 81.00 109.68 138.36 Foreman LFM 79,33 107.18 135,03 UTILITY Group 1-General LG1 71.99 96.17 120.35 Operator Foreman UOF 94.87 131.15 167.43 Group 2-Wrapper To 6" LG2 72.91 97.55 122.18 Foreman UFM 80.08 108.96 137.84 Group 3-PTO/Wrapper>6" LG3 73.83 98.92 124.02 Welder UWD 78.28 106.26 134.24 Group 4-Pipe layer,C&S 1G4 76.41 102.80 129.19 Journeyman/Fuser UJM 67.48 90.49 113.49 Groups-Blaster LG5 77.00 103.68 130.36 Pipe Tradesman II UP2 51.78 67.12 82.46 Apprentice-6th Period(85%) LAS 58.67 81.34 104.02 ELECTRICIANS/INSIDE WIREMEN (Rates subject to project location&employee base location) TEAMSTERS General Foreman EGF 112.51 155.17 197.82 Operator General Foreman TOG 103.97 141.91 179.86 Foreman EFM 104.65 143.37 182.10 Operator Foreman TOF 100.63 136,91 173.19 Journeyman EJM 96.79 131.58 166.37 General Foreman TGF 79.98 105.93 131.89 Apprentice-10th Period(85%) EA0 84.32 113.89 143.46 Foreman TFM 78.31 103.43 128.55 Group 2-2 Axle TG2 75.21 98.78 122.35 PROJECT MANAGEMENT Group 3-3 Axle TG3 75.44 99.13 122.81 Project Manager MPM 111.65 152.73 197.24 Group 5-Working Truck Driver TG5 75.81 99.68 123.55 Superintendent MSP 114.19 153.59 198.37 Group 6-4 or More Axle TG6 75.86 99.75 123.65 Project Engineer MPE 77.75 113.79 149,83 Group 9-Lo-Bed TG9 77.08 101.58 126.08 Safety Director SAD 109.73 149.23 193.88 Group 12-WTD BoomTrk Cert TBT 79.18 104.73 130.29 Safety Supervisor SAS 97.65 133.09 171.86 Subsistence: $95.00/day Travel Time: Customer will be advised if travel time is applicable Overtime Rates: All hours outside regularly constituted shift shall be time and one half. Saturday is time and one half. Sundays and holidays shall be paid at double time. For Operating Engineers,Laborers,Teamsters,Cement Masons,Electricians-first four(4)hours outside regular shift,and first twelve(12)hours on Saturday is time and one half;all additional hours at double time including holidays. Emergency"call out work"-Four(4)hour minimum for labor and equipment. Markup: Material,subcontractors,subsistence,and outside rentals(including fuel costs),will be billed cost plus sales tax where applicable,plus mark-up of 15% Boundaries of Southern California Cost Plus Rates' consists of the eleven(11)counties of Los Angeles,Inyo,Mono,Orange,Riverside,San Bernardino,Imperial,Ventura,Santa Barbara,San Luis Obispo,Kern and in addition: Richardson Rock,Santa Cruz Island,Arch Rock,San Nicholas Island,Catalina Island,San Clemente Island,San Miguel Island, Santa Barbara Island,Santa Rosa Island,Anacapa Island,including the Channel Islands Monument. Rate Scale does not include San Diego County. NOTE; Wage scales are in accordance with all current applicable signatory labor agreements,and are subject to change without notice. This rate sheet is not all inclusive; additional classifications available if required.(v2.0) CA C.L.273024 11232 E.Firestone Blvd.,Norwalk,CA 90650 Phone: (562)864-6566 Fax: (562)864-6052 www.dotybros.com CA Lic.273024 EXHIBIT A Construction Comoanu MASTER EQUIPMENT LIST AND RATES SOUTHERN CALIFORNIA COST PLUS RATES EFFECTIVE JULY 1,2013 TO JUNE 30,2014 BACK HOES ID# Hourly Rate ROAD EQUIPMENT ID# Hourly Rate AUGER #1189 $ 20.00 CABLE DOLLY-ONE REEL(Trailor Mounted) $ 12.00 Accessory-COMPACTION WHEEL EXECAVATOR #1181 $ 40.00 CABLE DOLLY-THREE REEL(Trailor Mounted) $ 25.00 Accessory-COMPACT WHEELF/CASE-JD #1179 $ 20.00 FLASHING ARROWBOARD- (4 HR.MIN.) $ 17.00 Accessory-HYDRAULIC BREAKER/CASE&JD #1183 $ 50.00 GRADER-CAT 140 #87791 $ 83.63 Accessory-VIBRATORY PLATE #1535 $ 90.00 GRINDER/COLD PLANER (BITELLI)- (4 HR.MIN.) #1187 $ 232.00 Accessory-BACK HOE FORKS (4 HR MIN.) 4749901 $ 7.50 ROLLER - (RIDE ON) $ 29.50 CC-135A ROCK WHEEL #1313 $ 75.00 ROLLER(WALK BEHIND)-1 TON VIBRATOR $ 23.50 CASE 580/JD 310 $ 40.82 ROLLER TRAILER $ 12.00 CASE 590 $ 42.82 STREET SWEEPER (4 HR.MIN.) #3319 $ 43.13 CAT 300 -TRACK MOUNTED #4055 $ 114.38 TILT TRAILER #6366 $ 12.00 CAT 345-TRACK MOUNTED #4072 $ 144.38 TRENCHER TRAILER #6481 $ 12.00 HITACHI ZX20 EXCAVATOR-WHEELED #4188 $ 98.13 UTILITY TRAILER #6452 S 12.00 CAT 916 #4147 $ 38.82 ZIPPER PAVEMENT GRINDER (PER DAY RATE) #1800 $ 375.00 1D 710 $ 46.82 ASPHALT PAVER-LEE BOY 10000 #1196 $ 115.63 TRENCHER-VERMEER T758-RIDE ON #4218 $ 145.00 CEMENT SAW-WALK BEHIND #1938 $ 33.50 WATER WAGON (PER DAY RATE) #6271 $ 40.00 COMPACTION EQUIPMENT ARROW (HYDRO HAMMER)/STOMPER $ 44.50 TRUCKS SHEERS FOOT-Tow Behind(Vibrating) #1169 $ 16.50 2-3 TON LUBE TRUCK #3450 $ 17.38 WACKER TAMPER #1860 $ 23.50 5 Yard(Flat bed or Bobtail)Dump/2-3 Ton Utility Truck $ 24.63 PADFOOT COMPACTOR 66" #1501 $ 32.94 BACK HOE MOVER TRUCK $ 21.63 CEMENT C1 WHEEL and compressor #3338 $ 55.63 COMPRESSORS W/90 LB.BREAKER.CLAY SPADE&TAMPER TRUCKDUMP10 WHEELER $ 32.63 COMPRESSOR 125.185 CFM $ 21.50 EQUIPMENT TRAILER-20,000 LB $ 14.00 COMPRESSOR-AIR,PORTABLE (PER DAY RATE) #1808 $ 106.00 EQUIPMENT TRAILER-40,000 LB $ 16.00 FLAT BED with LIFT #3693 $ 23.63 CRANES FLAT BED with MIXER/DUMP #3392 $ 55.63 BOOM TRUCK-8 TON #3647 $ 35.63 LOWBED TRAILER w/tractor&move permit fees #3456 $ 46.63 BOOM TRUCK - 10-11 TON $ 50.63 LOWSIDE END DUMP TRAILER W/TRACTOR #3418 $ 43.63 BOOM TRUCK- 14 TON $ 54.63 PICKUP TRUCKS - MISC.TOOLS NOT INCLUDED $ 16.38 BOOM TRUCK 23-25 TON #3308 $ 59.63 PICK-UP-RENTAL NUMBER R7700 $ 16.38 CRANE-RT/15-18 TON(or equivalent) $ 61.63 SERVICE TRUCK-10 TON- (Incl.Compressor,Gen,&Tools) $ 32.63 SERVICE TRUCK- MISC TOOLS NOT INCLUDED $ 18.38 DOZERS/SIDEBOOMS SERVICE VAN - MISC TOOLS NOT INCLUDED $ 16.38 DOZER JD 450 #5078 $ 44.69 TEST PUMP TRUCK #3401 $ 80.63 SIDEBOOM CAT D-6 $ 58.69 TEST TRAILER(Hyprostatic) (#6549&6674) $ 32.00 SIDEBOOM CAT D-7 #5063 $ 67.69 UTILITY VEHICLE (NON-HWY) $ 23.38 SIDEBOOM CAT 561 #5045 $ 64.69 VACUUM TRUCK -SOFT DIG #3908 $ 39.13 SIDEBOOM CAT 572 #5067 $ 79.69 WATER TRUCK - (1,500-2,000 GALS) $ 35.63 SIDEBOOM JD 450 $ 42.69 WATER TRUCK - (3,500 GALS) #3464 $ 40.63 WINCH TRUCK #3395 $ 30.63 FORKLIFTS FORKLIFT-HYSTER 20,000 LB #1203 $ 35.82 MISCELLANEOUS FORKLIFT-LION 6,000 LB #1204 $ 23.82 BOARING MACHINE HYDRAULIC #1521 $ 25.00 BORE MACHINE TRAILER #6447 $ 10.00 LOADERS TAP MACHINE(Water lines 3"to 12")(Per inch/per day) #828 $ 30.00 MINI SKID STEER-DITCH WITCH #1275 $ 27.82 TAP MACHINE(Water lines up to 2")(Per Inch/Per daY) #820 $ 20.00 LOADER-BOBCAT W/BUCKET #11848 $ 27.82 LOADER-BOBCAT W/SWEEPER #11845 $ 37.82 WELDERS LOADER-BOBCAT W/GRINDER #1184G $ 57.82 200 AMF-TRUCK MOUNTED $ 29.88 RUBBER TIRE LOADER-5441D #5086 $ 47.63 200 AMF,SKID MOUNTED or TRAILER $ 16.88 RUBBER TIRE LOADER-644 JD #5511 $ 58.75 WELDER-RIG RENTAL NUMBER R7704 $ 29.88 RUBBER TIRE LOADER-930 CAT #5089 $ 49.63 RUBBER TIRE LOADER-950 CAT #5087 $ 60.63 CUTTING TORCH (ACETYLENE) #926 $ 1800 RUBBER TIRE LOADER-950E/F CAT #5099 $ 7163 RUBBER TIRE LOADER-966 CAT #5070 $ 66.63 SKIPLOADER- CASE 580/ MF 40E/F 445 $ 32.82 FABRICATION SHOP&EQUIPMENT #101 $ 90.00 Pale I ot2 11232 E. Firestone Blvd.,Norwalk,CA 90650 Phone: (562)864-6566 Fax: (562)864-6052 www.dotybros.com CA Lie.273024 EXHIBIT A ii b II 111 1 I . I4_4/. _ o Construction Comoanu MASTER EQUIPMENT LIST AND RATES SOUTHERN CALIFORNIA COST PLUS RATES EFFECTIVE JULY 1,2013 TO JUNE 30,2014 MISCELLANEOUS ID# Daily Rate MISCELLANEOUS ID# Daily Rate ADDITIONAL(1)TORQUE HEAD FOR HYDRAULIC TORQUE WRENCH #3091 $ 50.00 PIPE PUSHER/GRUNDORAM-HERCULE #1939 $ 600.00 AIR HOSE 3/4"X 50' #870 $ 8.00 PIPE TONGS (4",6",8",10",12",16",18",20") #1936 $ 50.00 AIR SAW #857 $ 50.00 PIPE ROLLERS (FOR 2"TO 36"PIPE) #899 $ 24.00 AIR TAMPER #859 $ 35.00 PIPE STANDS (FOR 8"TO 12"PIPE) #900 $ 5.00 ASPHALT SPREADER BAR #1193 $ 125.00 PIPE SKIDS (4"X6"X 4'LUMBER) #898 $ 1.00 BARRICADES #880 $ 2.50 PIPE WRAPPING MACHINE-HAND HELD-ACCUWRAP II 2"-6"WIDTH #1930 $ 25.00 BEVELING BAND 14"-20" #833 $ 75.00 PLASMA CUTTER-PORTABLE #888 $ 150.00 BEVELING BAND 24"-42" #834 $ 100.00 PLYWOOD 1/3 REPLACEMENT COST #897 $ 3.00 BEVELING BAND 4"-12" #832 $ 50.00 PNEUMATIC/HYDRAU TORQUE WRENCH #3090 $ 150.00 BEVELING MACHINE 14"-20" #830 $ 75.0D PORTABLE BAND SAW #860 $ 35.00 BEVELING MACHINE 24"-42" #831 $ 100.00 POWER THREADER #853 $ 85.00 BEVELING MACHINE 4"-12" #829 $ 42.50 PRESSURE WASHER TRAILER MOUNT. #6941 $ 160.00 BORING MACHINE-CASE HYDRA #1092 $ 160.00 PUMP-SKID MOUNT BENTONITE #1166 $ 107.00 BORE MOTOR #854 $ 10.00 PUMP-SUBMERSIBLE #861 $ 27.00 BORING MACHINE 1-1/2"&13/4" (Accu-punch) #1178 $ 1500 RIGID ROLL GROOVER (#873&#856) $ 30.00 BORING MACHINE 4"-8" (Accu-punch) #1520 $ 25.00 RIVET BUSTER/RIPPING GUN #869 $ 50.00 BORING MACHINE 3-1/2" (Accu-punch) #1177 $ 20.00 ROCK DRILL (Plus Steel) #865 $ 35.00 BUFFER&GRINDER 4836 $ 25.00 ROCK SEPARATOR-GRIZZLY #1811 $ 85.00 BUILDER LEVEL-AC-2X NIKON #845 $ 25.00 ROTARY HAMMER (Plus Steel) #852 $ 50.00 . CEMENT MIXER $ 43.00 SANDBLASTER-UNIT(with accessories) #1175 $ 125.00 CHAIN LINK FENCE PANELS #846 $ 3.00 SAWZALL #874 $ 15.00 CHAIN SAW 16" (INCLUDES BLADES) #850 $ 50.00 SCISSOR LIFT-TEREX #1285 $ 115.00 CHIPPING GUN (Plus Steel) #868 $ 35.00 SHORING LUMBER 3"X12"X14' (1/3 REPLACEMENT COST) #895 $ 3.00 CLAY SPADE (Plus Steel) #866 $ 35.00 SHORING LUMBER 8"X8"X8' 0/3 REPLACEMENT COSI) #896 $ 3.00 CLEANING BALL #890 $ 10.00 SKILL SAW (INCLUDES BLADES) #835 $ 20.00 COM-A-LONG/CHAIN #886 $ 15.00 TAP MACHINE-T D.WILLIAMSON(UP TO 3") #827 $ 100.00 CONCRETE FINSHER #1823 $ 125.00 TAR POT #862 $ 50.00 CONCRETE VIBRATOR #891 $ 40.00 TEST PLUG #892 $ 10.00 CONSTRUCTION SIGNS #882 $ 4.00 TEST PUMP 200 LB.-400 LB.SPRAGUE #1815 $ 125.00 CROSSING PLATES #878 $ 6.25 TEST PUMP 5,000 LB. TRAILER MOUNTED #6818 $ 187.00 CUT OFF/CHOP SAW (INCLUDES BLADES) #810 $ 53.00 TEST PUMP High Pressure #1940 $ 125.00 DEAD WEIGHT TESTER $ 60.00 TEST PUMP Partable 2001b (#816&#817) $ 80.00 DELINEATORS #879 $ 2.50 TESTING TABLE #1834 $ 60.00 DRILL MOTOR 1/2" #811 $ 20.00 TORQUE WRENCH-HAND-3/4"DRIVE 0-600 ft lbs #3092 $ 4.00 DRILL MOTOR 3/4" #812 $ 25.00 TRAFFIC CONES #881 $ 2.50 DRY ROD OVEN-PORTABLE #813 $ 25.00 TRAILER-JOBSITE STORAGE (MOBILE) #6194 $ 20.00 DUCT ROD #855 $ 30.00 TRANSIT-THEOLITE #845C $ 35.00 EMULSION POT SPRAYER $ 60.00 TRENCH BOX-6'X 10' #1910 $ 200.00 FLOODLIGHT TRIALER (MERCURY VAPOR LIGHTS) $ 125.00 TRENCH BOX-4'X10' #1909 $ 130.00 FLOW LINER #841 $ 25.00 TRENCH JACK (SCREW) #877 $ 4.00 FUSION MACHINE 1-4"Macelroy #3096 $ 50.00 TRENCH JACK(HYDRAULIC) #876 $ 20.00 FUSION MACHINE 4-12"Macelroy #3095 $200.00 TRENCHER-VERMEER-WALK BEHIND #1160 $ 125.00 GENERATOR (3.S.5 KW) #1807 $ 53.00 TRI-VISE #884 $ 25.00 GENERATOR (75 KW) #6280 $ 75.00 VIBRATOR PLATE $ 91.00 HEAT TRACER #814 $ 25.00 WALKIE TALKIES (SET OF 2) #893 $ 25.00 HEATER #815 $ 25.00 WATER HOSE 11/2"X 50' #871 $ 6.00 HOLIDAY DETECTOR #838 $ 25.00 WATER HOSE 21/2"X50' #872 $ 750 HYDRAULIC STAR CUTTER #889 $ 100.00 WATER PUMP 2" Portable #1831 $ 53.00 IMPACT GUN 1" #819 $ 25.00 WATER PUMP 3" Portable #1832 $ 80.00 IMPACT GUN 1/2" #821 $ 15.00 WEEDEATER #116 $ 50.00 IMPACT GUN 3/4" #822 $ 2000 WELDING SHIELDS(6'X 10'FRAME) 4901 $ 5.00 IMPACT WRENCH 1" #864 $ 35.00 WET/DRY VACUUM #4589901 $ 10.00 LADDER #875 $ 10.00 WHALERS HYDRAULIC #1894 $ 300.00 LASER LEVEL #845B $ 75.00 WINCH 10 TON(GRUNDO) #6042 $ 300.00 LEAF BLOWER #824 $ 25.00 SAFETY AND HAZMAT EOUIPMENT Daily Rate LIGHT STAND #849 $ 15.00 4 WAY GAS MONITOR #921 $ 25.00 MANHOLE BLOWER WITH HOSE 8" #840 $ 43.00 MULTI-GAS DETECTOR/PID #914 $ 105.00 MANHOLE BLOWER WITH HOSE 12" $ 55.00 SUPPLIED AIR RESPERATOR KIT #922 $ 125.00 PAVEMENT BREAKER/JACKHAMMER #867 $ 35.00 ESCAPE AIR PACK #918 $ 25.00 PIPE BENDER 5"GREENLEE #1885 $ 100.00 H2S MONITOR #920 $ 15.00 PIPE BENDER 2"GREENLEE #1886 $ 100.00 HAZMAT SUIT-TYVEK #912 $ 8.00 PIPE BENDER MACHINE 6-20" (Plus shoes/freight per day) #1082 $ 400.00 HAZMAT TRAILER #6648 $ 20.00 PIPE BENDER SHOES/1082 BENDER 41190 $1165.00 WEEKLY RESPERATOR APR- HALF/FULL MASK(CARTRIDGE INCL) #911 $ 5.00 PIPE CUTTER-RIDGID SOIL #885 $ 15.00 SCBA-SELF CONTAINED #916 $ 55.00 PIPE CUTTER LINEUP CLAMP 16"-36" #839 $ 50.00 SCBA CYLINDER-EXTRA #917 $ 35.00 PIPE CUTTER LINEUP CLAMP 8"-14" #851 $ 25.00 TRIPOD WITH WINCH #913 $ 100.00 PIPE LOCATOR #843 $ 25.00 TWO WINCH RETRIEVAL BOOM #4719901 $ 250.00 PIPE LOCATOR-METROTECH #1935 $ 40.00 P.F.D.-PERSONAL FLOTATION DEVICE #923 $ 5.00 FULL BODY HARNESS 11924 $ 5.00 Page of 11232 E. Firestone Blvd.,Norwalk,CA 90650 Phone: (562)864-6566 Fax: (562)864-6052 www.dotybros.com CA Lie.273024